This sizable EV installation was part of the construction of a new 1600 space car park at Walgrave Hospital in Coventry.
The MSF team worked with the client from conception, design, planning and installation to deliver a new high voltage 800kVa connection from the network operator, Western Power, along with new lighting, CCTV, Automatic Number Plate Recognition (ANPR) power supplies, EV distribution pillars and 34 22Kw three phase charge points.